Applying Factors to Specific Rooms, Systems, and Change Orders

Choose which rooms, systems, options, and change orders each factor charges

Written by Support

Every factor in a project used to apply to the whole project. Now you choose where each one applies. A permit fee can skip your change orders, a shipping factor can charge only one building, and a markup can cover just the rooms that need it.


Where to find it

Open a project and go to the Overview tab. Under Factors, click + Add Factor, or click the name of a factor that's already in the project. The factor window has a section called Apply to Items Inside These: with three lists: Rooms, Systems, and Coverage.
​



Choosing where a factor applies

  1. Open the factor from the Overview tab.

  2. Under Apply to Items Inside These:, uncheck anything the factor shouldn't charge. The checkbox at the top of each list checks or unchecks the whole list.

  3. Click Save.

The factor total updates right away, and the factor is only split among the rooms it covers.


How Rooms, Systems, and Coverage work together

A factor charges an item only when the item's room, its system, and where it sits (the main project or an option/change order) are all checked.

List

What it controls

Rooms

Which rooms the factor charges.

Systems

Which systems the factor charges.

Coverage

Main Project plus each option or change order. Uncheck Main Project to have the factor charge only options or change orders.

Example: a 10% Equipment Markup with only the Conference Room and the Audio system checked charges audio items in the Conference Room. It doesn't charge video items in the Conference Room or audio items in the Lobby.


Rooms, systems, and change orders you add later

Each list ends with an Apply to New checkbox (Apply to New Rooms, Apply to New Systems, Apply to New Options or Change Orders).

  • Checked: anything you add later is covered automatically.

  • Unchecked: anything you add later shows up in the list unchecked, and you can check it yourself.

If the project doesn't have any options or change orders yet, hover over the icon next to Coverage for a reminder that they'll appear in the list once you add them.


Seeing what a factor adds to options and change orders

On the Overview tab, a factor that changes any option or change order shows two amounts, like $200 / +$100:

  • The first amount is what the factor charges the main project.

  • The gray amount is the total it adds to (or takes off) your options and change orders.

Hover over the i icon to see the breakdown: the main project's amount, then each option or change order with its own amount. An option that's covered but adds nothing to the factor shows +$0.
​


A factor that only touches the main project shows a single amount and no icon.


Merging an option or change order

When you click Merge to Room, a Merge window shows how the merge affects your factors, so the project total ends up at the previous total plus what the option or change order sold for.

  • Factors Being Added: factors that keep the price right after the merge.

    • A factor named like Shipping (from Lobby Upgrade) carries over what that factor charged on the change order, as a flat price.

    • A factor named like Shipping: merge adjustment (Lobby Upgrade) is negative. It cancels out a percentage factor on your main project that would otherwise start charging the merged items.

  • Factors Being Removed: factors that only applied to the change order you're merging, so they'd no longer cover anything. (A factor with Apply to New Options/Change Orders checked is kept.)

  • Net Change From Factors: the total of the changes above.

The window also reminds you that any items the change order replaces will be deleted from the project, and that merging can't be undone. You can delete any of the added factors from the Factors list afterward.
​



Good to know

  • Existing projects: factors already in your projects stay checked for everything, so totals don't change until you edit them.

  • New factors: most factors start checked for everything. Flat Price and Trip Calculator factors start on the Main Project only, so adding one doesn't also charge every option and change order.

  • Flat prices on change orders: a flat-price factor charges its full amount everywhere it's checked. If you check a $500 flat factor on the Main Project and one change order, the change order adds another $500.

  • Nothing checked: a factor with nothing checked in a list stays in the project at $0.

  • Upgrade/downgrade prices: when a change order replaces items, the credit for those items uses the factors that applied to them in the main project.

  • Convert to Flat Price: converting a percentage factor still sets it to the main project only, so it stops charging your options and change orders.

  • Room and system names: if your company renamed Rooms or Systems, the lists use your names.

  • Locked projects: you can view a factor's coverage on a locked project, but not change it.

  • Journey: coverage changes appear in the project's Journey under Factors, like Factor "Shipping" No Longer Applies to Lobby Upgrade. Merges list the factors added and removed.